Case Studies

Case Study Summaries

Case Study Summaries

 

TA Industrial Solutions has deep experience helping production finishers and metal fabricators maximize first time yield at the lowest operational cost in the industry. During our 65 years of providing industry ­leading supplies distribution and process optimization services we have assisted more than 2500 customers. Case Study Summary

3M PPS

3M PPS

 

Customer requested a lower cost on aerosol spray paint. Safety Director desired to lower the VOC levels and not slow down production. Case Study 3M PPS

Metal Fab Sawing

Metal Fab Sawing

 

Improve productivity of saw operation; currently a bottleneck in the production process. Minimize CapEx. Case Study ag equipment fab sawing

Sanding Dust Control

Sanding Dust Control

 

Control metal and aluminum dust in the rework area. Minimize CapEx and keep dissimilar metal dust segregated. Case Study Dust Control

Process Specific Training

Process Specific Training

 

Improve First Time Yield (FTY) through process training and standardize the process across 3 shifts
Case Study Process Specific Training

Saw and Process Review

Saw and Process Review

 

Slow cut time and inconsistent quality on high density/high cost solid round. Multiple blade types used, creating confusion for operators and unpredictable machine performance.
Case Study steel service center sawing

Call 800-331-0904 or email info@taindustrial.net